Harvard Boat Houses

Shadley Associates worked with Harvard University and Architects Brunner/Cott and Peterson Architects on renovations to Harvard’s two iconic boathouses along the Charles River. Newell Boathouse was originally completed in 1900 on the Boston side of the Charles, while Weld Boathouse was completed in 1906 on the Cambridge side.

Newell underwent extensive renovations including new boat storage sheds and parking areas, which are all located to minimize site impacts and constructed with sustainable improvements including porous paving, infiltration chambers, and newly created wetlands. The landscape design preserves, enhances, and extends the existing riparian ecosystem with a naturalistic aesthetic along the riverfront, prioritizing the removal of unhealthy and invasive plants while protecting existing healthy mature vegetation and adding significant new native plantings.

For the Weld site, the formal terrace along busy Memorial Drive was refreshed while respecting its historic design. Like the Newell site, proposed new elements were integrated with minimal impact and existing vegetation was preserved and enhanced.

Both projects were subject to rigorous design review and permitting processes. Construction was completed in the summer of 2024 prior to the Head of the Charles Regatta in October.